Altered Hydrology

The basics of drainage and why it is done, installing drainage, the wetland hydrology technical criterion, the terms “effectively drained” and “lateral effect”, and drainage setback tables. (Time: 15 minutes)

Wetland Hydrology Monitoring Part 1

(Time: 30:42)  This is the first of two training modules on the topic of wetland hydrology monitoring – offered as an auxiliary part of the Wetland Delineator Certification Program (WDCP) basic wetland delineation course. It is an introduction to the what, why, where, and how of wetland hydrology monitoring, including types of monitoring, levels of effort, questions that are answered by monitoring, shallow monitoring wells and piezometers, planning, documentation, and maintenance.

WASCOB Tile Design

The training shows the tile design components of the WASCOB Design spreadsheet. This video finishes the basin system design started in the WASCOB Design Intro video. The tile design tabs and output pages will be explained through this recorded demonstration. The user will see where data is entered and get a better understanding of how to draft up and design the tile outlet system as part of the WASCOB practice. (Time: 19:22)