High Tunnel System

(Time: 10 mins, 39 secs) This video is about a high tunnel that was built in St. Paul Minnesota by Urban Roots during the summer of 2018 with financial and technical assistance from USDA/NRCS. Urban Roots has been growing vegetables on the East Side of St. Paul for 20 years. This years planted crops include cucumbers, peppers, and ginger.This video demonstrates the step-by-step procedure for building a high tunnel in an urban setting. The advantages and methods for growing vegetables, including pest management in a high tunnel system, are discussed.

Project Management 101

(Time: 30 min)  This video provides background and tips for managing projects. The content is broken up into four modules:

  • Module 1:  Selecting and working with a consultant
  • Module 2:  The 5 phases of Project Management
  • Module 3:  Project monitoring and controls - the use of Earned Value Management
  • Module 4:  How to identify red flags in project management

Prescribed Burning

(Time: will vary) This course is designed to introduce the student to the fundamental basics of prescribed burning. At the end of the course the student should have a working knowledge of fire law, fire terminology, fire prescriptions, firebreaks, smoke management and a basic understanding of how to conduct a prescribed burn. This course is not intended to take the place of workshops, training sessions and actual experience in the field conducting prescribed burns.